Commercial03/2025

Esbjerg

Esbjerg 6700, Denmark
WEESSProject Overview

About the Project

Bodensee Energy Storage System in Esbjerg

System Configuration

Product LineBodensee
Power Rating200 kW
Storage Capacity464 kWh
Number of Systems2
WEESSProject Description

At the Esbjerg site, two Bodensee energy storage systems with a capacity of 232 kWh each have been installed. The systems are deployed in an industrial facility and primarily serve to optimize self-consumption and manage load profiles.

The application includes the following key functions:

Self-consumption optimization:

Surplus PV energy is stored temporarily and used later within the facility instead of being fed into the grid.

Peak shaving:

By discharging the batteries during peak demand periods, load peaks are reduced and grid costs are optimized.

Load shifting:

Energy is stored during periods of low demand or lower electricity prices and used when demand is higher.

Through this setup, the customer achieves improved energy efficiency, reduced electricity costs, and enhanced utilization of the existing PV system.

WEESSGallery

Project Images

WEESS Bodensee 232 battery storage facility opened, with visible battery modules

Related Projects

Lake Constance Front render

Bodensee

C&I battery storage for peak shaving, more cost-effective use of PV and flexible energy applications in the commercial sector.

Have a similar project?

Let's explore how WEESS can turn your building into energy infrastructure.