Multi-family house03/2026

Essen

Essen 45133, Germany
WEESSProject Overview

About the Project

In Essen, a 10 kW / 20 kWh Zugspitze system with PowerTower and a third-party inverter was selected.

System Configuration

Product LinePowerTower, Zugspitze
Power Rating10 kW
Storage Capacity20 kWh
Number of Systems3
Power Tower1
InverterThird-Party
WEESSProject Description

In the heart of Essen's urban environment, a 10 kW / 20 kWh Zugspitze system with PowerTower and a third-party inverter was selected. The solution combines high efficiency with technical flexibility and demonstrates how modern energy systems can be successfully integrated into existing structures.