Weess Logo
Technicians are installing WEESS battery storage and energy distribution systems in the plant room
Back
Multi-family house03/2026

Gescher

Gescher 48712, Germany
WEESSProject Overview

About the Project

Open System Integration for three residential units in Gescher.

System Configuration

Product LinePowerTower, Zugspitze
Power Rating10 kW
Storage Capacity15 kWh
Number of Systems3
Power TowerYes
InverterThird-Party
WEESSProject Description

For three residential units in Gescher, a high-performance energy supply was implemented with three 10 kW / 15 kWh Zugspitze systems, a PowerTower and an inverter from a third-party manufacturer.

Despite different system components, WEESS technology ensures central control and high overall performance. The result is a sustainable, cost-efficient and future-proof energy supply.

WEESSGallery

Project Images

WEESS’s fully installed energy storage system with three battery storage units in the building

Have a similar project?

Let's explore how WEESS can turn your building into energy infrastructure.